Case study: benefits tracking that finance signs off

1 November 2022 · 2 min read · Lean Six Sigma · Case study

A manufacturer’s improvement program had lost credibility because claimed savings never appeared in the accounts. A finance-validated method lowered reported savings but narrowed the claimed-versus-validated gap from 48% to 6%, more than doubled project approvals and nearly doubled the program budget.

Key numbers

Claimed vs validated gap
48%6%
▲ Improved −87%
Projects approved per quarter
49
▲ Improved +125%
Program budget
$220k$410k
▲ Improved +86%

The improvement program had a problem nobody wanted to say out loud. Every quarter, project teams reported impressive savings. Every quarter, the finance director looked for those savings in the accounts and could not find most of them. Over time, the program's numbers had stopped meaning anything to the leadership team, and new projects were becoming hard to approve.

The situation

An analysis of the previous year showed the gap: claimed savings were nearly double what finance could validate. Some claims counted cost avoidance as hard savings, some used baselines from unusually bad months, some ignored volume changes, and a few savings had been claimed by more than one project.

What changed

The program adopted the approach described in benefits tracking: making savings your CFO believes:

  • Benefit categories defined with finance: hard savings that appear in the profit and loss, cost avoidance and soft benefits, reported separately and never added together.
  • Baselines agreed before each project started, using a representative period and adjusted for volume changes.
  • Finance sign-off required before a project could close, with a follow-up check a few months later to confirm the saving had been sustained.
  • One owner per saving, so nothing was double counted.

What the data showed

In the first quarter under the new method, validated savings were half of what teams claimed. By the fourth quarter, claimed and validated savings were almost the same, as teams learned to measure properly from the start. The gap between claimed and validated savings narrowed from 48% to 6% over the year.

Results

Reported savings fell, but the numbers were now trusted. Leadership approved more projects, nine per quarter instead of four, and nearly doubled the program budget, from $220,000 to $410,000, because it could now see a credible return.

Why lower numbers built more support

Credibility is worth more than size. A smaller saving that finance can see in the accounts supports investment decisions; a larger one that nobody believes undermines them. Once leaders trusted the numbers, they treated the program as an investment rather than a cost.

Lessons for your operation

  • Agree definitions and baselines with finance before projects start.
  • Separate hard savings, cost avoidance and soft benefits.
  • Require finance validation before projects close, and check again later.
  • Expect reported numbers to fall at first, and trust to rise.
Polycon Engineering TeamEngineering and manufacturing consultants since 2013
Start a conversation

Let’s turn your next idea into a market-ready product.

Whether it’s a bold new product, a strategy that needs sharpening or an operation that should be doing more, a conversation with a senior consultant is the fastest way to find out what’s possible.

  • Free initial consultation with a senior engineer
  • Response within one business day
  • Confidentiality and NDA available on request
ServingAustralia · New Zealand · United Kingdom · United States · Asia

Prefer to give us the full picture? Use the detailed project enquiry form

Tell us about your project

Fields marked * are required. Your details are handled under our Privacy Policy.