Skip to content
Innovation · Product Strategy · Manufacturing Consulting · Melbourne, est. 2013 1300 765 926info@polyconint.comBook an obligation-free discussion

Case study: an idea system generates 1,140 ideas in a year

26 June 2018 · 2 min read · Kaizen · Case study

A food packaging manufacturer’s suggestion box collected about three ideas a month, mostly unanswered. Visual idea boards, fast decisions and the rule that teams implement their own ideas produced 1,140 implemented ideas in a year and 71% participation.

Key numbers

Ideas implemented per year
381,140
▲ Improved +2900%
Employee participation
6%71%
▲ Improved +1083%
Average days to decision
34 days4 days
▲ Improved −88%

The suggestion box at a food packaging manufacturer hung on the canteen wall, collecting about three ideas a month. Most received no reply. Decisions, when they came, took more than a month. Participation was around 6% of employees, and many of the ideas that did arrive were complaints rather than suggestions.

The situation

Leadership believed the workforce had plenty of ideas. The system simply gave them no reason to share them. Ideas disappeared into a box, were judged by managers far from the work and rarely led to visible change.

What changed

The box was replaced by a system built on a few simple principles:

  • Idea boards in every team area, where anyone could post a problem and an idea on a simple card.
  • Boards reviewed at the daily team meeting, so every idea was seen within a day.
  • A simple rule: ideas the team could implement itself were approved on the spot, and the person who had the idea implemented it, with help where needed.
  • Larger ideas, needing money or other departments, were decided within one week.
  • Monthly recognition of implemented ideas, with before-and-after photos shared across the site.

Leaders reinforced the system by asking about the boards during their daily walks, the approach described in gemba walks: what leaders should look for.

Results

Implemented ideas rose from 12 in the first month to around 144 a month by the end of the first year. In total, 1,140 ideas were implemented in the year, compared with 38 the year before. Participation rose from 6% to 71% of employees. The average time to a decision fell from 34 days to four.

Most ideas were small: better labels, safer handling, faster set-ups, clearer instructions, a tool holder in the right place. Individually, each saved minutes. Together, they changed how the site worked, and how people felt about working there.

Why it worked

  • Small ideas were welcome, so everyone could contribute.
  • Fast response showed that ideas mattered.
  • People implemented their own ideas, so they owned the results.
  • Recognition was frequent, simple and visible.

Lessons for your operation

  • If your suggestion scheme collects few ideas, look at the system, not the people.
  • Make ideas visible in the work area and review them daily.
  • Let teams approve and implement small ideas themselves.
  • Measure participation and speed of response, not just savings.
  • Use the habit of small improvements as the foundation for larger kaizen events and projects.
Polycon Engineering TeamEngineering and manufacturing consultants since 2013
Start a conversation

Let’s turn your next idea into a market-ready product.

Whether it’s a bold new product, a strategy that needs sharpening or an operation that should be doing more, a conversation with a senior consultant is the fastest way to find out what’s possible.

  • Free initial consultation with a senior engineer
  • Response within one business day
  • Confidentiality and NDA available on request
ServingAustralia · New Zealand · United Kingdom · United States · Asia

Prefer to give us the full picture? Use the detailed project enquiry form

Tell us about your project

Fields marked * are required. Your details are handled under our Privacy Policy.